So we signed our closing documents last Friday with First Colebrook Bank.  First thing Saturday morning we began :) 

Site work: Oct. 30. 2010

Around 8:30 am sat morning.....topsoil being pushed off the top into stockpiles


Jared in the excavator stockpiling topsoil from site.


more topsoil.....


and more......

C had to be tied up.....he was running in front of the dozer :)


AND MORE!  turns out we had roughly 12-15 inches of topsoil!  Must have been good farming land~


Breaking Ground!!  That is the start of a cellar hole :)


J coming to check out the cellar hole....


more cellar hole digging!


J's grandfather (also known as Papa) supervising :)



Its getting there!


We had many helping hands, we are so grateful for all of the family & friends who are helping!


J checking grade!



so the left side of the foundation will be a walk-out.....that's why they are only leaving 3 sides up!

A LOT accomplished in just the first day!!!!!

Almost Home :)

Site work & Forming up the Foundation Footings: Oct. 31 2010

Today's wonderful help included; Jared, J, Pixie (J's dad), Papa, Uncle David (conc. guru), Curtis (J's younger brother & me!

J's dad getting ready to set up the concrete footing forms. (the footings are the very bottom of the foundation.  Our foundation walls will sit centered on the footing, and the slab will rest up against the wall and the top of the footing).






C and I :)

Ok-  so in order to have a walkout, the concrete on that side of the house has to be below frost line.  So where the forms drop down into the hole is called the frost wall.  If you think about it, your concrete wall is below frost line on the other three sides, so we have to make sure that the concrete on the walk out is below frost line as well.....



Beautiful day!

Hard at work!


roughing in the septic system!


End of day two: complete forms all set and ready for concrete on day three!  Great start!


No comments: